The Jet Express 2026 season calendars show the Sandusky route, which serves Kelleys Island, Put-in-Bay and Cedar Point, operating for the last scheduled day on Monday, September 7, 2026; every later September date is marked as no trips scheduled. The Port Clinton to Put-in-Bay route runs later into the fall, with the final scheduled operating day shown as Sunday, October 25, 2026. From late September the Port Clinton calendar shows service on Sundays, Fridays and Saturdays only, with Mondays through Thursdays marked as no trips. The operator's schedule page states that scheduled trip times are subject to change without notice.
News
Jet Express Sandusky route ends September 7; Port Clinton service to Put-in-Bay runs to October 25
Boaters who leave a vessel at the islands or send crew back to the mainland need to know when passenger ferry service from each port stops for the season.
🔊 Listen to this article
Audio narration is not available for this article.
Source:
Jet Express.
Evidence checked August 10, 2026.
This is an original summary written for Cedar Point Marina; follow the source link for the publisher's full context.
Was this useful?
Anonymous. We do not know who you are and your answer is not shown next to your name. It goes to our editor.